{"id":316,"date":"2025-08-27T14:34:17","date_gmt":"2025-08-27T14:34:17","guid":{"rendered":"https:\/\/brecon.questo.nl\/?post_type=artikel&#038;p=316"},"modified":"2025-10-30T15:59:35","modified_gmt":"2025-10-30T15:59:35","slug":"10-step-cleaning-plan","status":"publish","type":"artikel","link":"https:\/\/www.brecon.nl\/en\/artikel\/10-stappenplan-reiniging\/","title":{"rendered":"10-step cleaning plan"},"content":{"rendered":"<section class=\"l-section wpb_row height_small\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default\"><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"w-separator size_small\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p><strong>COMMISSIONING AND CLEANING OF A CLEANROOM<\/strong><br \/>\nDeveloping and building a cleanroom is a specific field. The client wants a dust-poor and\/or germ-poor environment for its activities. Achieving that goal during and after construction involves a lot of work! The delivery, validation and proper functioning of a cleanroom is strongly linked to, among other things, cleaning during the construction work, furnishing and use thereof. In cooperation with our PP4C partner WERO, which specialises in cleanroom cleaning, we have drawn up a 10-step plan to give our client a good impression of what this involves.<\/p>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/section><section class=\"l-section wpb_row height_small\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default\"><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><h2 class=\"w-text us_custom_39d3b7fd has_text_color\"><span class=\"w-text-h\"><span class=\"w-text-value\">10-step plan<\/span><\/span><\/h2><div class=\"w-separator size_small\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><section class=\"av_textblock_section av-1eexp-f6744c69371353cfebd94b911ab90cbc\">\n<div class=\"avia_textblock\">\n<p><strong>PHASE 1 - Cleaning during construction activities<\/strong><br \/>\nPurpose: To prevent unnecessary dust accumulation in later hard-to-reach places.<\/p>\n<p>Construction contractor's responsibility. If building contractor has little or no experience with cleanroom cleaning, it is recommended that this is carried out by an experienced and specialist cleaning organisation. Brecon has employees with the required knowledge and experience!<\/p>\n<p><em>Norm:<\/em> Vacuum clean and deliver.<\/p>\n<\/div>\n<\/section>\n<\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><section class=\"av_textblock_section av-3m11v9-7a4a2b07e96cf32cbc16e1678629d368\">\n<div class=\"avia_textblock\">\n<p><strong>PHASE 2 - Cleaning during installation work<\/strong><br \/>\nPurpose: To remove mostly localised contamination resulting from installation work, such as installation of electricity, gas, water, etc., during the work.<\/p>\n<p>The use of a hoover and\/or other cleaning materials is necessary.<\/p>\n<p><em>Norm:<\/em> Vacuum clean delivery.<\/p>\n<\/div>\n<\/section>\n<\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><section class=\"av_textblock_section av-396yu5-2dd4f34256898cbe81498454844f4003\">\n<div class=\"avia_textblock\">\n<p><strong>PHASE 3 - First construction cleaning<\/strong><br \/>\nPurpose: After completion of construction and installation work, remove all visible contaminants on ceilings, walls, floors, fixed inventory edges\/riches (including filter suspensions) etc.<br \/>\nPossibly apply protective coatings to the floor.<\/p>\n<p><em>Norm:<\/em> All horizontal and vertical surfaces visibly clean.<\/p>\n<\/div>\n<\/section>\n<\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><section class=\"av_textblock_section av-2xev39-030cdc2b86ed25607e4acbdffca3e73b\">\n<div class=\"avia_textblock\">\n<p><strong>PHASE 4 - Pre-rinsing the air handling system<\/strong><br \/>\nPurpose: To remove any dust present in the ducts, by collection using bag filters per duct. Building up overpressure in the rooms.<\/p>\n<p><em>Norm:<\/em> Channels visibly clean; floors visibly clean<\/p>\n<\/div>\n<\/section>\n<\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p><strong>PHASE 5 - Cleaning prior to filter assembly<\/strong><br \/>\nPurpose: Removal of sedimented and\/or adhered dust from ceilings, walls, floors and fixed inventory. Aim optically dust-free, check with string light, no visible dust clusters left present.<\/p>\n<p><em>Norm:<\/em> Wiper clean.<\/p>\n<\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"wpb_text_column us_custom_39d3b7fd has_text_color\"><div class=\"wpb_wrapper\"><p><strong><span>After completion of phase 5, the clean room may only be entered with prescribed clothing!<\/span><\/strong><\/p>\n<\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><section class=\"av_textblock_section av-2733hp-d55c2e492d6b989099c77ade7669d7e0\">\n<div class=\"avia_textblock\">\n<p><strong>PHASE 6 - Installation of the filters (HEPA)<\/strong><br \/>\nPurpose: Prior to each filter placement, clean overlay edges on all sides.<\/p>\n<p>Immediately remove any contamination arising during filter assembly(CG cloth). Direct responsibility of filter assembly technicians.<\/p>\n<p><em>Norm:<\/em> Maintain requirements of phase 5.<\/p>\n<\/div>\n<\/section>\n<\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p><strong>PHASE 7 - Air treatment plant including filters adjustment<\/strong><br \/>\nPurpose: To rid circulating air of suspended dust particles and create overpressure in rooms.<\/p>\n<\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><section class=\"av_textblock_section av-1j15vp-2f2074d1fab7dc4c77141f978e6b54f8\">\n<div class=\"avia_textblock\">\n<p><strong>PHASE 8 - Bringing cleanroom into prescribed class<\/strong><br \/>\nPurpose: To rid all surfaces in order ceilings, walls, inventory, floors of sedimented and\/or adhered dust.<\/p>\n<p>Professional cleanroom cleaning by people observing all disciplinary regulations, appropriate routing and movement discipline.<\/p>\n<p><em>Norm:<\/em> Wiper clean<\/p>\n<\/div>\n<\/section>\n<\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p><strong>PHASE 9 - Checks and measurement procedures<\/strong><br \/>\nPurpose: To check whether the cleanroom is functioning as planned after which delivery to client can take place. Measurements by installer or on his behalf. (Validation)<\/p>\n<\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><section class=\"av_textblock_section av-wlc39-1d9ca1a4a721207141cea5dfe983117c\">\n<div class=\"avia_textblock\">\n<p><strong>PHASE 10 - Daily and periodic cleaning<\/strong><br \/>\nGoal: Keep cleanroom in the condition it was designed for, even in the long term.<\/p>\n<p>It is advisable to draw up a cleaning programme. This is a cleaning programme adapted to the cleanroom that takes into account the specific requirements of the production area and the client's wishes.<\/p>\n<p>Recommendation: The contract to be drawn up should include a detailed specification of the work programme including specification of the machinery and cleaning resources and materials to be deployed.<\/p>\n<\/div>\n<\/section>\n<\/div><\/div><div class=\"w-separator size_small\"><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><section class=\"av_textblock_section av-jd979-603ada717f577c8649cfe098910f55a7\">\n<div class=\"avia_textblock\">\n<p><strong>Explanatory standards:<\/strong><\/p>\n<ul>\n<li>\u2018Vacuum clean\u2019: using a hoover to remove all loose dust and dirt.<\/li>\n<li>\u2018Visibly clean\u2019: contamination, dust or dirt visible to the naked eye must have been removed.<\/li>\n<li>\u2018Wiper clean\u2019: a white cleanroom wiper must not be visibly soiled after randomly checking parts of surfaces.<\/li>\n<li>\u2018Iron light clean\u2019: the particles visible with the iron light on a surface must have been removed.<\/li>\n<\/ul>\n<p>Commissioning, control and cleaning procedures take two to three weeks on average. Validation generally takes place \u201cas built\u201d and takes approx. one to two weeks. Depending on the complexity and size of the cleanroom and air treatment installation, the above time periods may vary.<\/p>\n<\/div>\n<\/section>\n<\/div><\/div><div class=\"w-separator size_small\"><\/div><\/div><\/div><\/div><\/div><\/section>","protected":false},"excerpt":{"rendered":"IN GEBRUIK STELLEN EN REINIGEN VAN EEN CLEANROOM Het ontwikkelen en bouwen van een cleanroom is een specifiek vakgebied. De opdrachtgever wenst een stof arme en\/of kiem arme omgeving voor zijn activiteiten. Om dat doel te bereiken tijdens en na de realisatie van de bouw komt er veel bij kijken! Het opleveren, valideren en goed...","protected":false},"featured_media":0,"template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-316","artikel","type-artikel","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.brecon.nl\/en\/wp-json\/wp\/v2\/artikel\/316","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.brecon.nl\/en\/wp-json\/wp\/v2\/artikel"}],"about":[{"href":"https:\/\/www.brecon.nl\/en\/wp-json\/wp\/v2\/types\/artikel"}],"version-history":[{"count":0,"href":"https:\/\/www.brecon.nl\/en\/wp-json\/wp\/v2\/artikel\/316\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.brecon.nl\/en\/wp-json\/wp\/v2\/media?parent=316"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}